United Arab Emirates
2007 to 2008
Utility Master Plan for Abu Dhabi International Airport, Abu Dhabi, UAE (GCC) Client: SCADIA; (Supervision Committee for the expansion of Abu Dhabi International Airport)
Company: SCADIA
Position held: Resident Project Manager
Projects: Utility Master Plan for Abu Dhabi New International Airport. The Abu Dhabi International Airport (ADIA) is located approximately 30 kilometres from the city centre of Abu Dhabi. ADIA is situated on approximately 2,800 acres and served over 9 million passengers in 2008. Current facilities consist of a passenger terminal complex, aircraft maintenance, general aviation, air cargo, public parking, and leisure and administrative facilities. Abu Dhabi International Airport is a primary international airport in the region. Infrastructure work which included the overall utility requirements for all facilities required in Planning Activity Level (PAL) 1A (Year 2015), PAL 2 (2025), PAL 3 (2035) and PAL 4/5 (2045). PAL 4/5 is expected to be the ultimate build-out for Abu Dhabi International Airport (ADIA) under current development scenarios. Responsible for the Coordination in between the Client and the Consultants (Parsons & Stanley), Budgeting, Civil, HVAC, Firefighting and Electromechanical Design work with regards of preparation of the Utility Master Plan for Abu Dhabi New International Airport
2003 to 2007
Grid & Primary Substations with associated OHL, Abu Dhabi, UAE
Client: ADWEA, AADC, ADDC and Transco
Company: SwedPower AB
Position held: Resident Project Manager
Projects: Consultancy Services, monitoring and on-Site Supervision to the local Power Authority.
The project includes following main technical components namely:
OHTL 220 kV, 200kV Grid stations with associated gas insulated switchgear, power transformers, 220/33/11, standby power generation; Primary substations power transformers 33/11 kV, GIS and AIS insulated switchgear, standby power generation.
Turnkey supply of 25 of new Primary Substations/Package Units 33/11kV (GIS/AIS) and 2 Grid stations 220/33/11kV (GIS/AIS). The project includes following main technical components namely, Grid stations, with associated GIS/AIS insulated switchgears with associated control and protection equipment, power transformer 220/33/11kV s, station service transformer 11/0,415kV, standby power generation, HVAC and Fire Fighting equipment and OHL 400/220kV. 400/200 KV OHL Shuweihat to Madina Zayed (400 Towers) 220 kV D/C OHL Connection for Substations (Ramah to Gayathy) (275 Towers
